.
*ubicación*: fábrica coatepec*negocio*: nestlé*años de experiência*: 3 años*licenciatura*: concluida*resúmen*:lead the technical side of capital investment project execution and coordinate contribution of all stakeholders (from investment project charter until start-up) by managing a cross-functional team whose objective is to oversee the capital investments relating to the company's fixed assets.
this could involve the relocation and optimizing of the existing fixed asset base and/or the purchase of new fixed assets.
*un día en la vida de*- * before starting the project design phase*: support the end to end project manager in defining the project team, project scope, goals and deliverables that support business goals in collaboration with senior management and stakeholders.
build the investment project charter and see to it that it is strictly followed throughout the project.- * during project design phase*: based on: nestlé corporate business principles, the nestlé standards, the local regulations, the defined user requirements specifications, the tpm characteristics of a unit operation (safety, quality, affordability, maintainability, operability and reliability) and, on top of all the previous, the workers safety during both, the construction and the further operation of the plant, execute the basic design and then the detailed design.- * during the project implementation phase*: lead the team and coordinate the contribution of all the stakeholders, to get the engineering side of the project implemented (e.g.
buildings, equipment erections, piping, utilities, etc.)
in accordance with the defined timing, cost and quality, the urs and the characteristics of a unit operation, all the elements of the project (including technical people training, as needed) in such a way that safety is always guaranteed on the whole project site and a vertical start-up is assured.- * during the start-up phase of the project*: coordinate efforts with the start-up manager and her/his team, to assure a smooth transition to operations, after the qualification and the verification of the installation have been finalized.prepare and distribute the project documentation of engineering, including the engineering part of the project final report and provide feedback to the maintenance prevention system.assure that the investment project charter has been fulfilled.- * during the whole project life*: be the engineering project team leader, meaning integrating, motivating, feed backing, coaching, developing, managing and evaluating team members and being their support and liaison with the steering committee and all the project's stakeholders.
keep the end to end project manager informed